Electrical details that work in real rooms
Layouts based on use
We position electrical points around furniture, appliances and daily routines.
Existing supply assessed
We check capacity and protection before connecting substantial new household loads.
Other trades coordinated
We plan first-fix electrical work before kitchens, floors and finished surfaces.
Make the electrics fit everyday home life
A socket hidden behind a wardrobe is not much use, and neither is a kitchen circuit planned after the cabinets arrive. Around 65% of our work is domestic, giving us regular experience of how homes are altered and used. We install new circuits, sockets, switches and internal lighting, including electrical provision connected with extensions, kitchens and refurbishments. The plan starts with your routines, furniture layout, appliance loads and future ideas. We also assess the existing supply and consumer unit before adding significant loads, because new equipment depends on suitable wiring and protection behind the finished fittings.


Coordinate cables before rooms are finished
Early planning makes domestic installation work neater and less disruptive. We agree fitting positions and cable routes before plastering, decorating, flooring or fixed furniture closes off the sensible options. Safe isolation and access requirements are discussed in advance, especially where you remain in the property during the job. After installation, we inspect and test the completed circuits and provide the appropriate certification. If the existing system needs a broader upgrade, we explain that before work proceeds. The result should be practical power and lighting arranged for the room you actually use.
Frequently asked questions
Can we add sockets without rewiring the whole house?
Often, yes, if the existing circuit is suitable and has adequate capacity and protection. We assess the relevant wiring before adding points. If broader defects or limitations are present, we explain them rather than connecting new fittings blindly.
When should we plan electrics for a new kitchen?
Plan them before cabinets, splashbacks and finished surfaces are fitted. We need appliance details, layouts and preferred socket or lighting positions. Early decisions give us better cable routes and reduce the risk of opening newly completed finishes.
Will completed domestic work be tested?
Yes. We inspect and test the electrical work after installation and provide the appropriate certification. Testing confirms the circuit and protective measures operate as intended rather than relying only on whether a light or appliance switches on.
