A rewire planned beyond the cables
Full or partial scope
We assess what genuinely needs replacement instead of assuming every circuit is alike.
Layouts decided early
Socket, switch and lighting positions are agreed before first-fix work begins.
Disruption made visible
We explain access and power interruptions so other trades can be coordinated.
Replace wiring that no longer fits the property
Old or deteriorated wiring can limit alterations, leave too few usable circuits and create concerns that a small repair will not solve. We assess whether full or partial house rewiring is appropriate by looking at the installation's condition, planned renovation and future power needs. A full rewire replaces wiring across the property, while a partial rewire targets defined areas or circuits that can sensibly remain separate. Planning covers socket and switch positions, lighting, cable routes and the consumer unit. Our City and Guilds Level 3 IVQ Advanced Diploma training in Electrical Installation provides relevant grounding for this detailed work.


Plan disruption before finished surfaces
Rewiring usually needs access to walls, floors and ceilings, along with temporary interruptions to power. We discuss those practical points early and coordinate cable routes with the property layout. First-fix cabling should happen before decorating, finished flooring, kitchen fitting or built-in furniture wherever possible. We then fit the electrical accessories, make connections, inspect the installation and complete testing, labelling and certification. Obsolete wiring is removed where practicable. Making-good is a separate consideration, so we explain likely access points before work starts and help you avoid paying twice for finishes.
Frequently asked questions
How do we know if a full rewire is necessary?
We need to inspect the installation before advising. Deteriorated cabling, widespread alterations or insufficient circuits may support a full rewire. If sound sections can remain safely in use, a partial approach may be more appropriate.
Should rewiring happen before decorating?
Yes, wherever possible. Cable installation may require access to walls, floors and ceilings, so early electrical work protects finished surfaces from avoidable disturbance. It also lets you settle fitting positions before decorating limits the available routes.
Can we stay in the property during the work?
That depends on the scope, layout and ability to maintain safe supplies. Rewiring involves isolation, open access points and staged work. We discuss occupancy before starting so you understand which rooms and services will be affected.
